OUR PROJECTS

TCC New Head Office delivered alongside LT MCGuiness

Plumbing & Drainage

A new Tauranga City Council building built to a Green Star 6 rating. Works included plumbing and drainage, stormwater, wastewater, and water connections to public assets. Directional drilling was carried out for 355 stormwater lines down the bank with connections towards the harbour.

A 30,000-litre non-potable water tank was installed underground, requiring sheet piling for the installation. Also included was a pump station, water filtration systems, a hot water plant, and multiple meters and reticulation throughout the building serving toilet blocks and kitchenettes.