OUR PROJECTS

Omokoroa Country Club

Stage 1 & 2 Contact: Civil Drainage

Aquaholics was engaged by Omokoroa Country Club to install the new civil infrastructure drainage for both Stage 1 and Stage 2.

- Stormwater: Works included 1000mm diameter pipe down banks to a 3m diameter energy dissipation chamber before dispersing into the wetland. New Hynds UpFlo filters were installed to filter all site stormwater. Stormwater reticulation ranged from 1050mm RCCRJ concrete to 300mm concrete across the site, utilizing multiple manholes ranging from 1050mm to 3m in diameter, with some manholes weighing over 15T.

- Sewer: We established a WBOPDC 225mm sewer connection at the boundary. The site plan includes three sewer pump stations; under Stage 2, we installed the first pump station and associated 140mm PE rising mains. We successfully fitted out and commissioned pump station 1, with gravity sewer reticulation completed using PVC and rotomolded manholes.

- Water: Reticulation is provided via a 100mm boundary connection with a new RPZ and meter setup. Main reticulation and rider mains consist of 125mm and 63mm PE pipe. The network includes multiple hydrants and sluice valves, with 20mm mains for each house equipped with isolation valves and check meters. All pipework was pressure tested and chlorine dosed per IDC requirements.