OUR PROJECTS
Bayfair Expansion 2018
Plumbing, Drainage & Gas
This expansion added a new Countdown supermarket, multiple new retail spaces, a new cinema, and a dining and entertainment area. Aquaholics completed the majority of hydraulic services across the project, with drainage works in the later stages including sewer relays and dewatering to depths of up to 3.5 metres.
Works also included gas infrastructure and reticulation throughout the entire facility, and upgrades to the non-potable water system, featuring a 50,000 litre storage tank fed by new siphonic stormwater roof drainings, non potable water filtration systems, and pump systems. A new solar hot water system was installed for the communal toilet areas, along with multiple tenancy stubs and individual tenancy water supplies.